top of page
Search

Gas Plant Upgrade

  • Writer: Julie Boake
    Julie Boake
  • Dec 15, 2023
  • 1 min read

Project: Gas Plant Upgrade

Client: Beaumont Energy Inc.

Location: Kerrobert, Saskatchewan


Brown field 283 e3m3/d (10 MM Scf) Gas Plant Upgrade project to handle solution gas from Oil Treating Battery.  The facility included Inlet Separator, Regrigeration Unit, Booster Compressor, Sales Compressor NGL Bullet and Flare System and future upgrade bolt on capability which was executed later which included a new Motor Control Centre and Control system, addtional Refrigeration Unit and additional NGL Bullets.  BSG Engineering was responsible to scope the project through to commisioning which included regulatory registration and compliance, procrument and construction.


Gas Plant

Gas Plant

 
 
 

Comments


bottom of page