top of page

Battery Upgrade

Writer's picture: Julie BoakeJulie Boake

Project: Battery Upgrade

Client: Beaumont Energy

Location: Kerrobert, Saskatchewan


Brown field 1,270 m3/d (8,000bbl/day) Oil Treating Battery Upgrade project to handle emulsion from gathering system, internal trucked-in fluid and third party trucked-in fluid.  The facility upgrade included Inlet Separator, Oil Treaters, Tank Farm, Pump Skid modifications, Flare system and Vapor Recovery Unit.  BSG Engineering was responsible to scope the project through to commisioning which included regulatory registration and compliance, procrument and construction. Client needed an battery upgrade of their Kerrobert facility.


Battery Upgrade

Battery Upgrade

11 views0 comments

Recent Posts

See All

Comments


bottom of page